Guides · Newly-weds’ flats
Finishing a newly-weds’ flat: what comes first and what can wait
Finishing a newly-weds’ flat in 2026 begins with the things you will never see: the electrics, plumbing, waterproofing and air-conditioning pipework. Here are the priorities, a room-by-room checklist, calm colour schemes, ideas for a small flat, and the order and timing of the work before the wedding, with no prices.
What to spend on first: the things you can’t change without breaking
Spend first on everything buried in the walls and floors, because changing it after you move in means breaking out, dust and refinishing; leave for later what can be changed with a screwdriver and a ladder.
| Item | Get it right from the start | Why now |
|---|---|---|
| Electrics | The meter’s capacity, from the electricity company; a board with enough breakers; a separate circuit for each air conditioner, the water heater and the oven; enough sockets where they will be used | Adding one after painting means cutting the wall or a visible cable |
| Plumbing and waterproofing | Supply and drain pipes with proper falls; bathroom and kitchen floors waterproofed and turned up the walls; a flood test before tiling | Leaks show up after you move in, sometimes in the ceiling of the flat below |
| Air-conditioning first fix | Copper pipes, a drain line with a steady fall and a power supply to every room you will cool, even if the units are bought later | Buried pipework cannot be added after gypsum and paint without breaking out |
| Door frames | Plumb, and set to the finished floor level | A leaning frame shows on every door, and fixing it means taking it out |
| Floor levels | One level between rooms with no thresholds, and a fall towards the floor drain in the bathroom, kitchen and balcony | A raised threshold or standing water stays with the flat |
Chandeliers and light fittings, as long as their points are ready, wallpaper, light decoration, curtains and some furniture can start simple and be upgraded after the wedding without breaking anything. If the budget is tight, save on what shows, not on what is buried.
A finishing checklist for a newly-weds’ flat, room by room
Write the finishing list room by room before any tradesman starts, with the positions of the appliances and furniture, because they decide where every socket and water point goes.
- Kitchen: the appliance sizes before the first fix; a water and drain point for every appliance that needs one; a socket for each fixed appliance and sockets above the worktop; and an extractor outlet to the outside. Changes to the gas line or the cooker position go through the gas company.
- Bathroom: waterproofing and a flood test before tiling, a fall to the floor drain, an extractor fan or a window that really opens, and an earth-leakage breaker on its circuits. A gas water heater must not go inside a closed bathroom.
- Bedroom: a socket and a light point on each side of the bed, a light switch at the door and another by the bed, an air-conditioning point, and a curtain pocket in the ceiling if there is gypsum board. Fix the wardrobe position before the lighting is laid out.
- Reception: a TV wall with a socket, internet and satellite points and an empty conduit for the cables, lighting on more than one circuit, and an air-conditioning point.
- Balcony: a fall towards the drain, a slip-resistant floor suited to the outdoors, and a weatherproof socket. Ask the building management or compound where the outdoor air-conditioning unit may go, and about enclosing the balcony.
- Entrance: the distribution board somewhere easy to reach, and a point for the internet router roughly in the middle of the flat.
The furniture list itself is on the furnishing page; this guide is about the finishing.
Calm colours for a newly-weds’ flat: how to choose
The calm schemes newly-weds usually ask for rest on one light base colour for the whole flat and a single accent in one chosen place, not a different colour in every room.
- Warm white with beige: calm and easy to live with, and it goes with light wood and cream marble.
- Sandy beige with walnut or oak: warmer, and it suits the reception and the bedroom.
- Light grey leaning to beige, with white: a calm modern look, with a few black touches in the handles and light fittings.
- An accent on one wall: a light olive green, a grey-blue or a muted pink, behind the bed or behind the sofa.
Try a sample of each colour on the wall itself in morning light and at night, because colour changes with the light. Rooms with little sun look cooler, so a warm white usually suits them. Choose a washable paint in the kitchen and corridor; the wall paint colours guide covers the shades in detail.
Ideas for finishing a small flat so it feels bigger
A small flat grows through decisions, not demolition: light colours, reflected light, storage you cannot see, and doors that need no space to open.
- One light colour for walls and ceiling, and one floor through the reception, bedrooms and corridor, with no thresholds.
- Mirrors that reflect daylight, in the entrance or beside a window, and mirrored wardrobe doors.
- Hidden storage: wardrobes up to the ceiling, a bed with storage underneath, cabinets above the corridor door, and a niche in a wall that is not load-bearing and has no pipes or cables in it.
- Sliding doors for the wardrobe and the kitchen. A door that slides into the wall needs a frame built into the wall before plastering, and a stretch of wall with no switches or pipes, so decide early.
- Lighting on more than one level: a perimeter cove and wall lights instead of one central chandelier, without a full false ceiling that eats into the height.
- Plain fronts with recessed handles, in a colour close to the wall, so the wardrobes disappear into the room. That is the heart of a simple modern finish.
The order of works, and who to talk to before you start
The right order is simple: everything that breaks into walls and floors comes before everything that decorates them, and decisions on paper come before any tradesman.
Decisions on paper
The room layout, the kitchen and bathroom, and where the bed, TV, air conditioners and sockets go.
Permission and coordination
Ask the building management or compound about working hours, the lift, debris removal, the façade rules and outdoor air-conditioning units. Changes to the gas line or the position of the cooker or water heater go through the gas company, and big increases in electrical load through the electricity company.
Walls and door frames
Partitions and openings, and the door frames fixed to the finished floor level.
First fix
Electrics, plumbing and air conditioning, with a pressure test on the pipes and photos of the walls before they are closed.
Plaster and waterproofing
Plastering, then waterproofing the bathroom and kitchen, and the flood test.
Floors and wall tiles
Floor tiling and the bathroom and kitchen walls, then gypsum board and the first coats of paint.
Fitted pieces
The kitchen, doors, wardrobes, bathroom vanity and stone tops, after the final measurements.
Final coat and handover, then furniture
The last coat of paint, the clean, a room-by-room check against the quotation, and then the furniture goes in.
This coordination is practical advice, not a statement of law: the rules differ from place to place, so get the answer in writing. The finishing steps guide covers each stage in detail.
Timing before the wedding: start early, furnish last
Start as early as you can, because how long the finishing takes depends on the state of the flat, the amount of work and how quickly you decide, not on the wedding date.
- Settle the kitchen, bathroom, floors and colours before work starts; late decisions are among the commonest causes of delay and breaking out.
- Choose the tiles, sanitaryware and stone early, and buy all the tiles from one batch.
- The made-to-measure kitchen, wardrobes and doors are measured once the walls and floors are finished, not from the drawing, and then made.
- New plaster has to dry before it is painted, and that stage cannot be rushed.
- Leave a gap between the end of the work and the wedding for the clean, fixing snags and bringing in the furniture.
- If time is short, finish what is buried, the kitchen, the bathroom and the bedroom first, and leave decoration and decorative gypsum for later.
Rough quantities for your flat, and how to compare quotations
Quantities are worked out by the metre, not guessed. These examples use the quantity calculator’s own method and are not prices; they assume a ceiling of about 2.9 m and bathrooms of about 4 m² each:
| Item | About 85 m² net, one bathroom | About 100 m² net, two bathrooms |
|---|---|---|
| Floor tiles after wastage | 90–95 m² | 105–110 m² |
| Wall paint (excluding the bathroom, before openings are taken off) | 185–270 m² | 205–300 m² |
| Ceilings | 85–90 m² | 100–105 m² |
| Bathroom wall tiles after wastage | about 20 m² | about 40 m² |
| Skirting | 50–80 linear m | 55–90 linear m |
Enter the floor area first.
Rough quantities for your flat
| Item | Rough quantity |
|---|
A first estimate from standard rules of thumb, cutting waste included. Real quantities come from measuring the site and the drawings.
In the calculator, enter your net floor area rather than the contract area; the final quantities come from measuring on site. The finishing-cost-by-size guide explains what grows with floor area and what does not.
When you compare two quotations, compare the lines, not the totals: the quantity, unit and specification; whether waterproofing, the flood test and debris removal are written in; and who buys the materials and in whose name the invoice is issued. The finishing BOQ and finishing contract guides cover the lines, staged payments, timing and changes.
Itmam and newly-weds’ flats
Itmam (إتمام للتشطيبات والتوريدات) is a finishing, decoration and supply company based in Alexandria: the head office is in El Ibrahimya and the marble and granite showroom in El Deresa, Moharram Bey. We work in Alexandria, the North Coast and New Cairo, and elsewhere in Egypt when the job suits. Itmam was founded in 2016, with 20+ years in the trade.
We visit and measure the flat, then write a detailed, itemised quotation before any work starts. On a finishing contract you pay each supplier directly at their price, and the tax invoice is in your name; our management fee for supervision and execution is agreed in writing before we begin, and we add nothing to the price of materials.
Kitchens, wardrobes, doors, vanities, metalwork and stone tops are made in our own workshops; we also supply sofas and living-room seating, upholstery and curtains, and supply-only is available. Phone and WhatsApp +20 106 926 2572, Saturday to Thursday, 09:00 to 18:00.
Departments for this

Full Home Renovation
This is the contract most of our clients actually want: one company, one programme, one written quotation.
See more
Kitchens
A kitchen is the one room where bad manufacturing shows up daily — a door that drops, a drawer that catches, a worktop joint over the sink.
See more
Bathrooms
Bathrooms are won and lost behind the tiles.
See more
Bedrooms & Furniture
Fitted furniture is measured in millimetres and judged in reveals.
See more
Painting & Decorative Finishes
Paint is the finish everybody judges and the trade everybody rushes.
See more
Electrical & Smart Home
Electrics are invisible until they are a problem.
See moreWork we have done
Photo gallery
El Moghra
Turnkey build & finish · Desert lodge · Completed
View project
Market Street, Siwa
Façades, pergolas & shopfronts · A street of shops · Completed
View project
The Equestrian Yard
Stables, arena & yard · Working yard · In progress
View projectQuestions people ask
How much does it cost to finish a newly-weds’ flat?
What should we do first if the budget is tight?
Which calm colours suit a newly-weds’ flat in 2026?
How do I finish a small flat so it feels bigger?
How long before the wedding should we start the finishing?
What does a simple but stylish finish look like?
Read next
Finishing a flat, step by step
Finishing has a right order, and most expensive mistakes come from breaking it. Here is the sequence from bare walls to…
See more Guides · Before you startFinishing cost by flat size: what scales and what doesn’t
‘How much to finish a 100 m² flat?’ has no honest answer until someone has seen the flat. This page gives you something more…
See more Guides · Colour and paintWall paint colours and paint types: a guide to choosing
Calm wall paint colours such as off-white, vanilla latte and light grey are popular in Egyptian homes now, but the same colour…
See more Guides · Before you startThe finishing BOQ: every line that should be written down
A muqaysa, or bill of quantities, lists every job and material in your finish with its unit and specification. Read properly, it…
See more Guides · before you signThe finishing contract, clause by clause
Most finishing disputes start with something the contract did not say. This is a general checklist of the clauses an owner…
See more Areas · AlexandriaFurnishing a flat in Alexandria: bedrooms, sofas and curtains
Furnishing a flat in Alexandria has its own challenges: sea-air humidity tires wood and fabric, many older buildings have narrow…
See more Decoration · by styleModern interiors
Modern is not just taking the ornament away. It is clean lines, few materials and details built precisely, because simplicity…
See more Guides · HandoverTaking handover: what to check before you sign
Handover is the last moment when defects are easy to fix. Go through the unit room by room, with the power and water on, and…
See more Guides · Quantity calculatorHow much tile do you need? Work out m², tiles and cartons
The tile you buy is not the room’s area: there is wastage for cuts and breakage, and tile is sold by the carton, not the metre.…
See more Guides · Quantity calculatorHow much paint do you need? Work out the litres
There is no fixed amount of paint per metre: it depends on the wall and ceiling area, the number of coats and the coverage…
See more