
Build & MEP
Full Home Renovation — Turnkey
This is the contract most of our clients actually want: one company, one programme, one written quotation. We take a shell or a tired villa, and we hand back a finished home — because we own the stone yard, the joinery workshop, the metal shop and the MEP crews, the coordination happens inside our business instead of on your phone.
Scope of works
What we actually do.
Everything below happens inside our business — no subcontracted links in the chain.
- 01
Survey, design & budget
Measured survey, layouts, 3D visuals and a costed specification broken down by trade. You see where the money goes before you commit to it.
- 02
Demolition & structure
Strip-out, waste removal, new openings and blockwork, structural steel where walls come out, with engineer-approved drawings.
- 03
MEP first fix
Plumbing, drainage, electrical, HVAC and low-current routed and pressure-tested before anything closes up.
- 04
Finishes & plaster
Levelled plaster, gypsum ceilings and coves, screeds, paint systems, and the substrate discipline that makes everything after it look right.
- 05
Stone, joinery & glazing
Everything from our own divisions — marble, quartz, kitchens, wardrobes, doors, windows, shutters and ironwork, all cut from the same drawing set.
- 06
Handover & aftercare
Joint snag list, as-built drawings, the suppliers’ warranty papers and maintenance guidance.
Specification
The numbers, before you ask.
| How we charge | You pay suppliers directly at their price · a management fee for us · supply-and-fit by package |
|---|---|
| Programme | Dated Gantt at contract, updated weekly with photos |
| Payments | Milestone-linked to completed stages, not to calendar dates |
| Reporting | Weekly written update with photographs — essential for overseas owners |
| Typical duration | Set in the dated programme after the survey |

Selection
Types of project
Core-and-shell finishingNew delivery
A developer hands over bare concrete. We deliver a finished home — the most common New Cairo and New Capital job.
Full villa renovationExisting homes
Gut and rebuild, usually with layout changes, new MEP and a completely new stone and joinery package.
Chalet fit-outSahel
Fast, batched, seasonal. Design in winter, build in spring, ready before the season — furniture package included.
Penthouse & apartmentCairo / Alexandria
Occupied-building work with lift bookings, noise windows, protection of common areas and neighbours who need to be kept on side.
Rental & investment unitsYield-focused
Specification tuned for durability and turnaround rather than showroom finish, planned around the budget you set.
Gallery
Full Home Renovation in place.
Every photograph on this page was taken on one of our sites during the work. Nothing here is a stock image or a render.



Where it goes
- Core-and-shell finishing
- Full villa renovation
- Apartment & penthouse fit-out
- Chalet & holiday home fit-out
- Kitchen & bathroom packages
- Rental unit refurbishment
- Overseas-owner managed projects
Projects featuring full home renovation
Where we have used it.
Questions we get asked
Full Home Renovation — questions we get asked
What does turnkey actually include?
How long does a full renovation take in Egypt?
How do you charge, and how are payments staged?
I live abroad — can you manage the project without me there?
Do you work in the North Coast out of season?
Usually specified with
Related divisions

Kitchens
A kitchen is the one room where bad manufacturing shows up daily — a door that drops, a drawer that catches, a worktop joint over the sink.
See more
Bathrooms
Bathrooms are won and lost behind the tiles.
See more
Electrical & Smart Home
Electrics are invisible until they are a problem.
See more
Marble
We buy marble at the block, not off a photograph.
See moreRead next
Finishing cost by flat size: what scales and what doesn’t
‘How much to finish a 100 m² flat?’ has no honest answer until someone has seen the flat. This page gives you something more useful: which items…
See more Guides · Social housingFinishing a 90 m² social housing flat: what comes with it and what to do
Finishing a 90 m² social housing flat, or a 75 m² one, is rarely a job from scratch, because the unit is usually handed over finished. The real…
See more Guides · Newly-weds’ flatsFinishing a newly-weds’ flat: what comes first and what can wait
Finishing a newly-weds’ flat in 2026 begins with the things you will never see: the electrics, plumbing, waterproofing and air-conditioning…
See more Areas · New CairoFinishing in Madinaty: apartments and villas
Madinaty is a whole planned city beside New Cairo, with its own management and rules, and many of its units are built to repeated models. Finishing…
See more
