Finishing · by level
Super lux finishing, fully specified
Super lux is the level many flats in Egypt are finished to, and the label people understand in the most different ways. Here is a clear specification room by room, when it is enough, and where it is worth stepping up.
What does super lux mean?
Super lux is a mid-to-good level: materials of known, consistent quality, workmanship tighter than lux, and some visible detail such as gypsum ceilings and concealed lighting in the reception, without the natural stone and hidden systems that mark ultra super lux.
Because the label is not standardised between companies, the specification below describes what a decent super lux is usually understood to mean, not an official definition. Compare any offer you receive against it, and ask for every item to be written out.
And the point that matters most: super lux built carefully looks and lasts better than ultra super lux built carelessly. Workmanship — flatness, joints, corners and wall preparation — is as much a part of the level as the material.
The specification, room by room
This is what most people expect from a good super lux unit, space by space:
| Space | Floors and walls | Details |
|---|---|---|
| Reception and corridors | Medium to large porcelain with matching skirting; putty, sanding and enough coats of emulsion. | A gypsum board ceiling with concealed light and LED spots, with power, TV and data points placed for the furniture. |
| Bedrooms | Porcelain or good ceramic, or timber or SPC flooring if preferred; emulsion paint. | A gypsum cornice or simple ceiling, a light switch by the bed, and split-unit AC provision. |
| Bathrooms | Porcelain or ceramic on the walls up to the ceiling and on the floor, over waterproofing that is water-tested before tiling. | Good sanitaryware, sometimes a concealed cistern, exposed or concealed mixers, a moisture-resistant suspended ceiling and an extract fan. |
| Kitchen | Ceramic or porcelain on the floor and on the walls behind the units, over a waterproofed floor. | MDF or HPL units designed to the room, a granite or quartz worktop, and enough sockets for the appliances. |
| Balconies | Slip-resistant porcelain rated for outdoors, over waterproofing laid to falls. | Suitable exterior paint, a light point and a socket. |
Throughout the unit: cable sizes worked out from the loads, a distribution board with a breaker per circuit and proper earthing, good aluminium or UPVC window sections, and MDF or timber doors with decent locks and hinges.
Where it is worth stepping up
You do not have to choose one level for the whole unit. These few items lift the feel of a finish more than any others:
- Bathrooms: concealed mixers, a concealed cistern and glass for the shower. Changing them after tiling means breaking tiles, so decide before work begins.
- The reception floor: the largest surface you see. Larger porcelain or marble in the reception alone changes how the whole flat feels.
- Lighting: a simple lighting plan — general, concealed and accent — does more for a finish than a change of material.
- AC: if there is any chance of concealed AC later, prepare for it now in the ceilings, wiring and drainage.
- Windows on noisy streets: double glazing and well-sealed frames make more difference to sleep than any decoration.
When super lux is enough
Super lux is enough when the workmanship is careful and the specification is written down. It is the sensible choice in many cases:
- A flat for long-term rental: durable materials that are easy to find if part of them needs replacing.
- Children’s rooms, guest rooms and the guest bathroom: spaces that do not need luxury materials to work well.
- A unit you plan to renovate again before long: there is no point investing heavily in what you will change.
- A fixed budget: a complete, well-made super lux beats an ultra that is missing half its items.
If you want luxury in every item, the ultra super lux specification has its own page, and the difference between the two is set out item by item on the finishing levels page.
How to check the work really is super lux
The written specification
Every material with its type, size and grade in the quotation, not just ‘first-grade porcelain’. Write down what each item includes too: skirting, thresholds, adhesives and waterproofing.
Samples and batch numbers
A signed sample of every visible material, and what arrives on site checked against it. Look at the boxes: tiles should come from one production batch so the shade does not change from room to room.
Inspect before closing up
Photograph the electrical and plumbing first fix before plaster and tiling, ask for a pressure test on the water pipes, and a water test on the bathroom waterproofing before it is covered.
Handover
Shine a light along the walls to find waves, tap the tiles, check the joints run straight, and operate every socket, mixer, door and window before you sign.
What decides the cost
The cost of super lux is not set by the name but by decisions and quantities specific to your unit:
- Area and layout: the number of rooms and corridors changes the quantities of walls, ceilings and wiring, not just the floor area.
- The state you receive: starting on red brick is different from starting semi-finished, or from an old flat that needs stripping out.
- Bathrooms and kitchen: how many, how large, and the specification chosen for each.
- Floors: the material and size in each space, and whether marble goes into the reception.
- AC and windows: split-unit provision or readiness for concealed AC, and the window sections and glazing.
That is why we do not publish a price per metre. We visit, measure and give you a written, itemised quotation that you can compare with any other offer, item against item.
Itmam and super lux
For us, super lux is a written specification, not a word in a quotation. We visit and measure the unit, then give you a written, itemised quotation before work starts, and you can step up the level in one item and keep it in another.
On a finishing contract you pay each supplier directly and the tax invoice is in your name; our fee for supervision and execution is agreed in writing before we begin. Kitchens, wardrobes, doors, vanities and stone tops are made in our own workshops.
We work in Alexandria, on the North Coast and in New Cairo, and elsewhere in Egypt when the job suits us. Every photo on this site is from our own sites.
Departments for this

Full Home Renovation
This is the contract most of our clients actually want: one company, one programme, one written quotation.
See more
Bathrooms
Bathrooms are won and lost behind the tiles.
See more
Kitchens
A kitchen is the one room where bad manufacturing shows up daily — a door that drops, a drawer that catches, a worktop joint over the sink.
See more
Painting & Decorative Finishes
Paint is the finish everybody judges and the trade everybody rushes.
See more
Gypsum & Decorative Ceilings
The ceiling is where lighting, air conditioning and joinery all arrive at the same plane, which is why it is the first thing an eye catches when something is out.
See more
Electrical & Smart Home
Electrics are invisible until they are a problem.
See moreWork we have done
Photo gallery
The Equestrian Yard
Stables, arena & yard · Working yard · In progress
View project
Sea-view Villa — Marble & Brass
Turnkey finishing · Villa · In progress
View project
Pool Villa — Oak & Rattan
Exterior, pergola & interiors · Villa · In progress
View projectQuestions people ask
What does super lux finishing mean?
What’s the per-metre price for super lux?
Does super lux include central AC?
How can I tell a flat is really super lux?
When is super lux enough?
What is the difference between lux and super lux?
Read next
Finishing levels in Egypt, item by item
Lux, super lux and ultra super lux are words the whole market uses, and every company means something slightly different by…
See more Finishing · by levelUltra super lux: a written spec, not a slogan
Ultra super lux is not just expensive materials. It is decisions taken early, details built precisely and systems hidden behind…
See more Guides · Before you startThe finishing BOQ: every line that should be written down
A muqaysa, or bill of quantities, lists every job and material in your finish with its unit and specification. Read properly, it…
See more Guides · HandoverTaking handover: what to check before you sign
Handover is the last moment when defects are easy to fix. Go through the unit room by room, with the power and water on, and…
See more Guides