



Areas · Greater Cairo
Finishing company in Sheikh Zayed and 6th of October: apartments and villas
Looking for a finishing company in Sheikh Zayed and 6th of October? Itmam is based in Alexandria, and Sheikh Zayed and 6th of October are within our working area. Here is what changes when you finish a home west of Cairo: compound rules, desert heat and dust, receiving the unit before any work, and how a job runs with us from survey to handover.
Finishing in Sheikh Zayed and 6th of October: what is different?
Sheikh Zayed and 6th of October are two desert cities west of Cairo, with many compounds that have their own management and rules, districts of standalone buildings and villas, and a hot, dry, dusty climate. All of that changes how finishing should be planned.
- Compound apartments: you share neighbours, an entrance and a lift, and a management with its own rules.
- Villas, twin houses and town houses: a roof, a garden and a façade, and any outside change needs approval.
- Standalone buildings and villas in the districts: no compound management, but the building has its own routine and neighbours.
- Different handover states: red brick, semi-finished, finished by the developer, or a resale.
- Owners who live elsewhere: agree from the start how you will follow the work and approve decisions from a distance.
Receiving the unit before finishing: what to check
Take formal handover and write every remark in the handover record before any worker goes in, because a defect found after finishing starts is hard to trace back to its source. The reference is your contract and its specification annex, not what your neighbour received.
- The contract and specification annex: what should be there, item by item.
- Area and layout: compare the rooms with the drawings, and measure the heights.
- Walls and ceilings: cracks, walls out of plumb, or signs of damp or leaks.
- Water and drainage: the points are where they should be, and the drains clear when water is poured in.
- Power: the meter, the main board, and the capacity available against the AC units you plan.
- The roof of a villa or top-floor unit: ask about the waterproofing and a flood test.
- Windows and doors, if supplied: the seals, the glass, and how easily they open and close.
Photograph every remark, and ask for a written answer on what the developer will put right. Our handover checklist has a longer list, room by room.
Compound rules: what to ask the management before you start
Every compound has its own rules, and they change, so we do not list specific rules here. Get the answers in writing from the management before you fix any dates, and give a copy to whoever does the work.
- Finishing permit: is one needed? Which documents, and who submits them: the owner or the contractor?
- Working hours: on normal days and holidays, and the hours for noisy work.
- Contractor and worker entry: registration, and gate passes for workers, vehicles and materials.
- Deposit: is one paid before work starts? On what conditions is it returned?
- Debris: where it is collected, who removes it, and where it goes.
- Outside changes: the façade, windows, pergolas and the positions of AC outdoor units; treat them as not allowed until you have written approval.
- Shared areas: use of the lift for materials, and protection of the entrance and stairs.
Any structural change, such as opening a wall or adding load on the roof, needs the management’s approval and a structural review before it is built, not after.
Heat and dust: plan for the desert climate from the start
Summers are hot, the sun is strong, dust gets in through any gap, and the difference between day and night temperatures is large, so decisions on insulation and windows are made before plaster and gypsum board, not after.
- The roof: on a villa or a top-floor unit, thermal insulation together with waterproofing under the roof finish makes a clear difference to the rooms below, laid with falls to the drains.
- Walls: they are easiest to insulate while they are being built; in a unit whose walls are already up, most of the gain comes from the roof, the windows and the shading.
- Sun-facing glass: double glazing cuts heat and noise transfer, and on west- and south-facing façades ask about glass that reduces solar heat.
- Shading: shutters or louvres on the outside stop the sun before it reaches the glass, which works better than a curtain inside.
- Sealing windows against dust: profiles with continuous gaskets, brush seals on sliding windows, and a well-sealed gap between the frame and the wall. A hinged window usually closes tighter than a sliding one.
- Floors: matt and honed finishes hide dust and scratches better than high gloss, and quartz belongs indoors, out of direct sun.
Finishing levels: specify the items, not the name
Names such as lux, super lux and ultra super lux are not a standard specification: what one company calls super lux another calls lux. The reference is the quotation, with every item named by material, size and method.
| Level | What it usually means | Ask about |
|---|---|---|
| Lux | Basic materials and acceptable workmanship | The type of ceramic tile and sanitaryware, and the number of paint coats |
| Super lux | Porcelain, gypsum board with concealed lighting in the reception, and wiring on separate circuits | Materials by name, and the precision of levels and joints |
| Ultra super lux | Marble or large-format porcelain, concealed AC and made-to-measure pieces | Detailing, and how the ceiling, AC and lighting are coordinated |
One thing should not change between levels: waterproofing in the bathrooms, kitchen and balconies with a water test before tiling, and proper earthing of the electrics. Our finishing levels page compares them in detail.
Working with us from Alexandria: how a job runs
We are based in Alexandria, and a job in Sheikh Zayed or 6th of October runs in written steps, so you know what was agreed at every stage.
Send the details
The type of unit, its area and state, photos and drawings, and the compound’s rules if you have them.
Survey and measuring
We visit the unit, measure every room, and record the state of the walls, ceilings, water and power points.
The written quotation
An itemised quotation, line by line: materials, quantities, and what each line includes and excludes, before any work starts.
Choosing the stone
Choose marble and granite from the stone catalogue on this site, or see them in person at our showroom in El Deresa, Moharram Bey.
Approvals
Whatever the compound management requires is obtained before the first worker goes in.
Works and workshop pieces
First-fix services are tested before the walls are closed, and kitchens, wardrobes, doors, vanities, metalwork and stone tops are made in our workshops and arrive on site ready to install.
Handover
Every line checked against the quotation, every tap and circuit tried, and remarks written down and closed before handover.
Because you may not be on site every day, agree with us from the start how you will follow the work and approve decisions in writing.
Itmam and finishing in Sheikh Zayed and 6th of October
Itmam is a finishing, decoration and supply company from Alexandria: head office in El Ibrahimya, marble and granite showroom in El Deresa, Moharram Bey. We take finishing jobs in Sheikh Zayed and 6th of October, and we also work in Alexandria, on the North Coast and in New Cairo.
Kitchens, wardrobes, doors, vanities, metalwork and stone tops are made in our own workshops, and stone is templated, cut and installed by the same team. Imported marble is available alongside Egyptian stone.
We visit, measure and give you a written, itemised quotation before work starts. On a finishing contract you pay each supplier directly at their price, and the tax invoice is in your name; our management fee for supervision and execution is agreed in writing before we begin, and we add nothing to the price of materials. Supply-only is available.
Itmam was founded in 2016, with 20+ years in the trade. Phone and WhatsApp +20 106 926 2572, Saturday to Thursday, 09:00 to 18:00.
Departments for this

Full Home Renovation
This is the contract most of our clients actually want: one company, one programme, one written quotation.
See more
Kitchens
A kitchen is the one room where bad manufacturing shows up daily — a door that drops, a drawer that catches, a worktop joint over the sink.
See more
Bathrooms
Bathrooms are won and lost behind the tiles.
See more
Marble
We buy marble at the block, not off a photograph.
See more
Gypsum & Decorative Ceilings
The ceiling is where lighting, air conditioning and joinery all arrive at the same plane, which is why it is the first thing an eye catches when something is out.
See more
Electrical & Smart Home
Electrics are invisible until they are a problem.
See moreWork we have done
Photo gallery
El Moghra
Turnkey build & finish · Desert lodge · Completed
View project
Market Street, Siwa
Façades, pergolas & shopfronts · A street of shops · Completed
View project
The Equestrian Yard
Stables, arena & yard · Working yard · In progress
View projectQuestions people ask
How much does it cost to finish an apartment in Sheikh Zayed?
You are in Alexandria. Do you work in Zayed and October?
Do I need a permit from the compound before finishing?
How do I protect the flat from heat and dust?
I have just received the flat from the developer. What should I check?
How do I choose a finishing company in 6th of October?
Read next
New Cairo & Fifth Settlement
See more Areas · New CairoFinishing in Madinaty: apartments and villas
Madinaty is a whole planned city beside New Cairo, with its own management and rules, and many of its units are built to…
See more Finishing · by levelFinishing levels in Egypt, item by item
Lux, super lux and ultra super lux are words the whole market uses, and every company means something slightly different by…
See more Guides · HandoverTaking handover: what to check before you sign
Handover is the last moment when defects are easy to fix. Go through the unit room by room, with the power and water on, and…
See more Finishing · by propertyVilla finishing, inside and out
A villa is not a large apartment. It has several floors, a stair, a roof, a façade and a garden, and all of them need planning…
See more Finishing · by current stateCompleting a semi-finished flat without ripping it out
Semi-finished does not mean half the work is done. It means someone else has already done work that you will build on, so you…
See more Guides · Before you startThe finishing BOQ: every line that should be written down
A muqaysa, or bill of quantities, lists every job and material in your finish with its unit and specification. Read properly, it…
See more SupplyThe stone catalogue
See more Supply · ShowroomOur marble and granite showroom in El Deresa
Stone is not chosen from a photograph. At our showroom in El Deresa, Alexandria, you see the stone in person, compare finishes…
See more