Took handover of a unit in red brick? Then everything is still ahead of you, and this is the best moment to make the decisions right. Here are the stages in order, and the decisions that cannot wait.
What red brick and core and shell mean
A unit on red brick (على الطوب الأحمر) has its concrete frame and brick walls in place, with no plaster, no electrical or plumbing services and no floors.
Core and shell is a term developers use in compounds. It usually means the structure and the outside façade are done while the inside is still bare concrete or brick. Exactly what is handed over differs from one developer to another, so read the specification annex of your contract before handover.
- Usually in place: columns and concrete slabs, the outside walls, and sometimes the inside walls.
- Usually missing: electrical, plumbing and air-conditioning first fix, plaster, waterproofing, floors, doors and windows, paint and fittings.
- Varies by contract: outside windows, electricity and water meters, and the façade finish.
Before the first blow: measurements and drawings
The first step in finishing from red brick is not work on site; it is a measured survey and drawings.
- An accurate measured survey, because the original drawings do not always match what was built.
- A final layout: where every bathroom, kitchen and wall goes.
- Electrical drawings: sockets, switches, light points and the distribution board.
- Plumbing drawings: supply and drainage points for every fixture and appliance.
- The air-conditioning decision: split units or concealed ducted units, and where the outdoor units and drains go.
These drawings are what the quotation is built on, and the clearer they are, the more accurate the quantities.
The stages in order
This is the usual order in Egypt; some stages overlap depending on the size of the unit.
Block-work changes
Building or removing walls for the new layout, and forming door and window openings.
Electrical first fix
Conduit, boxes and the board position, following the drawings.
Plumbing first fix
Supply and drainage pipes, and points for water heaters and appliances.
Air-conditioning first fix
Copper pipes, condensate drains and unit positions.
Door frames and plaster
Fixing the door frames, then plastering walls and ceilings over levelling dots and screeds (بؤج وأوتار) so the surfaces come out flat.
Waterproofing
Waterproofing bathroom, kitchen and balcony floors, then a water test before anything covers it.
Ceilings and floors
Gypsum board ceilings, then tiles or marble, stairs, and bathroom and kitchen wall cladding.
Paint, fit-out and handover
Filler and undercoats, then doors, kitchen, sanitary ware and lighting, then the final coat, cleaning and handover.
Our guide to the finishing steps covers each stage in detail and what to check before closing it.
Decisions that cannot wait
Some decisions, if left until after the plaster, are paid for in demolition and rework.
- Socket and switch positions, especially by the bed, in the kitchen and where the television goes.
- The air-conditioning type and its pipe routes.
- The bathroom and kitchen layouts, and the position of every appliance and floor drain.
- The lighting plan and where concealed lighting sits in the gypsum.
- Data, camera and smart-control wiring, if you will want them.
- Water heaters: one per bathroom or a central heater, and where they go.
- The level of finish, because the materials decide layer thicknesses and floor levels.
Who supplies the materials
Finishing from red brick uses two kinds of material: base materials that disappear under the finish, and final materials you see every day. Both deserve the same attention.
- Base materials: cement, sand, bricks, pipes and cable. Their quality shows after years, not on handover day.
- Final materials: tiles, marble, sanitary ware, paint and doors.
- With Itmam you can take materials supply-only, or supply with installation.
- On a finishing contract you pay each supplier yourself and the tax invoice is in your name, so you know exactly what every material cost.
What sets the cost
The cost of finishing from red brick is set by the area, the level of finish, the materials and the number of bathrooms and kitchens, not by a fixed figure per metre.
- The area, though not every item grows at the same rate: bathrooms and the kitchen weigh heavily whatever the size.
- The level of finish: super lux or ultra super lux.
- The floors: porcelain or marble, and the tile size.
- The air conditioning: split units or concealed.
- How much block-work and layout change there is.
- Ceilings: gypsum board throughout or only in chosen rooms.
A price per metre given before anyone sees the unit is a general number. The accurate answer is a written quotation with quantities, which is what we prepare after the survey.
In a compound: approvals before changes
If the unit is in a compound, a change to the layout, the façade or the windows may need the developer's approval before it is carried out.
Each compound also has rules on worker access, working hours and debris removal. Ask the management for them in writing before you fix a start date.
How Itmam finishes from red brick
We visit the unit, measure it, and write you an itemised quotation before any work starts.
Building materials, finishing materials and stone are available from us supply-only or with installation. On a finishing contract you pay suppliers directly, the tax invoice is in your name, and our fee for supervision and execution is agreed in writing before work starts.
Kitchens, wardrobes, doors, vanities and metalwork are made in our own workshops. And if you have a plot rather than a shell, we build too.
We have 20+ years in this business, working in Alexandria, on the North Coast and in New Cairo.
Departments for this

Full Home Renovation
This is the contract most of our clients actually want: one company, one programme, one written quotation.
See more
VisualisationDesign & Engineering
We draw it before we build it.
See more
Electrical & Smart Home
Electrics are invisible until they are a problem.
See more
Gypsum & Decorative Ceilings
The ceiling is where lighting, air conditioning and joinery all arrive at the same plane, which is why it is the first thing an eye catches when something is out.
See more
Cement
You can buy cement from us by the bag, by the pallet or by the bulk tanker without hiring us to build anything.
See more
Blocks & Bricks
Blocks and bricks go out by the pallet, the thousand or the lorry load to whoever is building, with no requirement that we lay a single one.
See more
Plumbing & Sanitary Supply
Pipe, fittings, valves and sanitary ware are sold across the counter and delivered to site, with no requirement that we do the first-fix.
See more
Electrical Supply
Cable, boards, breakers and accessories go to anybody buying — a homeowner rewiring one room, a contractor loading out a villa, an engineer ordering against a single-line drawing — without a wiring contract attached.
See moreWork we have done
Photo gallery
The Equestrian Yard
Stables, arena & yard · Working yard · In progress
View project
Sea-view Villa — Marble & Brass
Turnkey finishing · Villa · In progress
View project
Pool Villa — Oak & Rattan
Exterior, pergola & interiors · Villa · In progress
View projectQuestions people ask
Where does finishing from red brick start?
How is the cost of finishing from red brick worked out?
Can I change the layout at this stage?
Red brick vs core and shell: what's the difference?
Do you also supply building and plaster materials?
Read next
Finishing a flat, step by step
Finishing has a right order, and most expensive mistakes come from breaking it. Here is the sequence from bare walls to…
See more Guides · Before you startThe finishing BOQ: every line that should be written down
A muqaysa, or bill of quantities, lists every job and material in your finish with its unit and specification. Read properly, it…
See more Finishing · by levelFinishing levels in Egypt, item by item
Lux, super lux and ultra super lux are words the whole market uses, and every company means something slightly different by…
See more Finishing · by current stateCompleting a semi-finished flat without ripping it out
Semi-finished does not mean half the work is done. It means someone else has already done work that you will build on, so you…