ITMAM Finishing · Decor · Supply
Cube wall lights throwing a star lattice across a rendered façade at nightLobby steps with Greek-key marble inlay and planter

Where we work

New Cairo & the Fifth Settlement

New Cairo is dominated by two jobs: finishing a core-and-shell delivery from scratch, and gutting a villa that was finished a decade ago to a standard nobody would accept today. We do a great deal of both, and they are the two we are called in for most often here.

Katameya HeightsMividaMountain View iCityVillette

The market

New Cairo & Fifth Settlement, specifically.

From Katameya Heights and Mivida through Mountain View, Villette, Palm Hills New Cairo, Hyde Park and the compounds along 90th Street, plus the older standalone villas in the First and Third Settlements — villas, townhouses, twin houses, duplexes and penthouse apartments.

Material selection is where most New Cairo projects lose weeks. We bring the slabs, door samples, hardware and finish panels to you on site — or you walk them at our Alexandria showrooms — so decisions get made against real materials in one visit instead of three rounds of photographs — and everything is fabricated in our own workshops and delivered complete.

What changes here

Local conditions we build for.

  1. 01

    Core-and-shell finishing

    The developer hands over bare concrete and a meter. We deliver a finished home — layouts, MEP design, plaster, stone, joinery, glazing, lighting and handover — against a written specification and an itemised quotation.

  2. 02

    Villa gut renovations

    Structural openings, re-planned layouts, complete new MEP, and stone and joinery packages that replace tired 2010s finishes entirely.

  3. 03

    Selection on site

    We bring physical slabs, door samples, hardware and finish panels to the property, so you choose against real materials in the light of your own rooms rather than off a screen.

  4. 04

    Everything in-house

    Marble, quartz, kitchens, wardrobes, doors, windows, shutters, ironwork and electrics all come from our own divisions — one contract, one programme, one written quotation.

  5. 05

    Compound-ready delivery

    Contractor registration, working hours, waste rules and neighbour management are handled by us, in compounds where the rules are strictly enforced.

  6. 06

    Occupied-home work

    Kitchen or bathroom replacements in a house you are still living in, sequenced and dust-protected so the home stays usable.

Coverage

Compounds and districts we work in

  • Katameya Heights
  • Mivida
  • Mountain View iCity
  • Villette
  • Palm Hills New Cairo
  • Hyde Park
  • Stone Park
  • Lake View
  • Uptown Cairo
  • Fifth Square
  • Al Burouj
  • Madinaty
  • Rehab
  • New Capital R7 & R8
  • Sheikh Zayed & 6th October

Not on the list? We travel — ask us.

Granite stair with stainless balustrade and brass newel over dark marble
Granite stair with stainless balustrade and brass newel over dark marble
Lobby with marble columns, inlay floor and stainless rails
Lobby with marble columns, inlay floor and stainless rails
Lobby steps with Greek-key marble inlay and planter
Lobby steps with Greek-key marble inlay and planter
Uplit palm and planter at night
Uplit palm and planter at night

Questions we get asked

New Cairo & Fifth Settlement — questions we get asked

How much does it cost to finish an apartment in New Cairo?
It depends almost entirely on specification, and anyone quoting a per-metre number before seeing the drawings is guessing. What we can tell you is where the money actually goes: stone, kitchens, bathrooms and joinery carry most of a premium budget, while plaster and paint are a small fraction. Send us the drawings and you get an itemised quotation broken down by trade.
Do you finish core-and-shell deliveries?
Constantly — it is the most common job in New Cairo and the New Capital. We take a bare concrete delivery through layouts, MEP design, plaster, screeds, stone, joinery, glazing, lighting and cleaning, and hand over a home ready to move into with as-built drawings and the suppliers’ warranty papers.
Can I see the materials before deciding?
Yes, and you should. We bring marble and quartz samples, kitchen door panels, hardware, glazing profiles and shutter sections to the property so you can judge them in your own light. For a large stone order we will also arrange a slab viewing so you approve the actual bundle before it is cut.
How long does a villa renovation take?
Six to twelve months for a full gut, three to five for an apartment. Structural changes and imported lead times move it most. You get a dated programme at contract and a written weekly update with photographs so you always know where it stands.
Do you work in Sheikh Zayed and the New Capital too?
Yes. Sheikh Zayed, 6th of October, Madinaty and the New Capital R7 and R8 districts are all within our routine working area, with the same crews and the same contract structure.

Written quotation

Tell us about the job. We reply with a written quotation.

Name and phone are enough to start. We call you back, ask the questions that matter, and you get an itemised quotation in writing — no figures guessed over the phone.

  • You pay the supplier directly, and the tax invoice is in your name.
  • Finishing, decoration and supply from one company.
  • Every photo on this site is our own work.

Or reach us directly

Please write your name.
Please write a phone number we can call.

We use your number only to answer this enquiry.

WhatsApp