Western Desert · 2026
Solar Power Plant
Utility scale, not a rooftop. A tracked rig driving the steel piles for the tracker rows, trenches opened and ducted for large-diameter DC cable, cable pulled and coiled, and outdoor inverter and combiner stations set on concrete plinths. Setting-out stakes across open desert give the scale away.
Project facts
| Location | Western Desert |
|---|---|
| Scope | Piling, trenching & inverter stations |
| Size | Utility scale |
| Status | In progress |
Divisions involved





The whole record
Every frame from this job — 19 photographs and 9 clips.
On site
Short walkthroughs.
Phone clips from our own visits — unpolished, and the closest thing to standing in the room.
More work
Other projects.

El Moghra
Turnkey build & finish · Desert lodge · Completed
View project
Market Street, Siwa
Façades, pergolas & shopfronts · A street of shops · Completed
View project
The Equestrian Yard
Stables, arena & yard · Working yard · In progress
View projectRead next
Contracting company in Alexandria: from land to finishing
Before you sign with a contracting company in Alexandria, know the order of the work and what protects each stage: the soil report before the…
See more Decoration · by styleHidden lighting: plan it before the gypsum
Hidden lighting is decided at the electrical first fix and built into the gypsum board. Planned in layers, in the right colour and with a driver you…
See more Guides · Newly-weds’ flatsFinishing a newly-weds’ flat: what comes first and what can wait
Finishing a newly-weds’ flat in 2026 begins with the things you will never see: the electrics, plumbing, waterproofing and air-conditioning…
See more Finishing · by propertyVilla finishing, inside and out
A villa is not a large apartment. It has several floors, a stair, a roof, a façade and a garden, and all of them need planning as one job. Here is…
See more